East Dell Range Blvd / US 30 Corridor Study

East Dell Range Blvd / US 30 Corridor Study

East Dell Range Blvd / US 30 Corridor Study Latest Updates Final East Dell Range Blvd / US 30 Corridor Study –  September 25, 2019 Appendix A – 30% Design Appendix B – Traffic Analysis Appendix C – Opinion of Probable Cost Appendix D – Crash...
Parsley Blvd Corridor Plan

Parsley Blvd Corridor Plan

Parsley Blvd Corridor Plan Summary of Project Parsley Boulevard is rural in character and does not accommodate all modes of travel including facilities for pedestrians or bicycles. ADA accommodations are also absent along the corridor and at the intersecting roads....
Cheyenne Frontier Days Traffic Study & Transportation Plan

Cheyenne Frontier Days Traffic Study & Transportation Plan

Cheyenne Frontier Days Traffic Study & Transportation Plan Summary of Project Cheyenne Frontier Days (CFD) annually hosts as many as 266,000 guests including rodeo participants, carnival staff and 2,500 volunteers during the ten-day event held the last full week...
Southeast Greenway Trail Connector

Southeast Greenway Trail Connector

Southeast Greenway Trail Connector Summary of Project A Greenway trail connector across the Union Pacific Railroad tracks from the Sun Valley neighborhood to other existing and planned Greenway facilities near Campstool Road, Burlington Trail and HR Ranch Road has...
High Plains Road

High Plains Road

High Plains Road Summary of Project The preliminary road corridor plan for the future High Plains Road was recently completed and adopted by the Laramie County Planning Commission and the MPO Policy Committee. This Plan amends the Cheyenne area’s Master Transportation...