by jen | Jun 9, 2021
Walterscheid Boulevard Plan Read the Final Walterscheid Blvd Corridor Plan Read the Final Walterscheid Blvd Corridor Plan Appendices Summary of Project As our community grows, transportation needs change, and our transportation system must adapt to these changes. With...
by jen | Feb 5, 2021
Resumen del proyecto de la rotonda de Prairie Avenue y Frontier Mall La construcción de la rotonda de Prairie Avenue y Frontier Mall Drive comenzó en agosto de 2020 y terminó a finales de diciembre. Los elementos finales, incluida la jardinería, se llevarán a cabo en la primavera de 2021....
by jen | Apr 28, 2020
Whitney Road Corridor Plan Review the plan now! Whitney Road Corridor Final Plan with Appendices and Adoptions Whitney Road Corridor Final Plan Appendix A Improvement Plans Appendix B Public Meetings Appendix C Presentations Appendix D Cost Estimates Appendix E...
by jen | Apr 28, 2020
East Dell Range Blvd / US 30 Corridor Study Latest Updates Final East Dell Range Blvd / US 30 Corridor Study – Septiembre 25, 2019 Appendix A – 30% Design Appendix B – Traffic Analysis Appendix C – Opinion of Probable Cost Appendix D – Crash...
by jen | Apr 28, 2020
Parsley Blvd Corridor Plan Resumen del proyecto Parsley Boulevard es de carácter rural y no acomoda todos los modos de viaje, incluyendo instalaciones para peatones o bicicletas. Las instalaciones de la ADA también están ausentes a lo largo del corredor y en las carreteras de intersección ....
Page 3 of 7«12345...»Last »