Evers Boulevard

Evers Boulevard

Evers Boulevard Summary of Project The MPO hired Ayres Associates, a Cheyenne planning and engineering firm, to do the analysis and prepare the Evers Boulevard Plan. The primary goal of this project is to provide a conceptual design for the reconstruction of Evers...
Downtown Lincolnway Placemaking Pedestrian and Urban Design Plan

Downtown Lincolnway Placemaking Pedestrian and Urban Design Plan

Downtown Lincolnway Placemaking Pedestrian and Urban Design Plan Summary of Project The Cheyenne Metropolitan Planning Organization is working with Russell + Mills Studios to evaluate and recommend potential pedestrian and urban design improvements to the Downtown...
Dell Range/Section 20 Corridor Study

Dell Range/Section 20 Corridor Study

Dell Range/Section 20 Corridor Study Summary of Project The Dell Range Corridor is one of the most heavily used roads in Wyoming. The area of this study hosts Cheyenne’s Frontier Mall along with several large retail stores and other commercial establishments. The...
Storey/Van Buren Official Map Plan

Storey/Van Buren Official Map Plan

Storey/Van Buren Official Map Plan Summary of Project As a result of this project from 2003, people can easily travel—by car, bike, or on foot—all the way from Powderhouse Road to Ridge Road in Cheyenne! View draft final report Before...
Division Avenue and Wallick Road Corridor Study – 2015

Division Avenue and Wallick Road Corridor Study – 2015

Division Avenue and Wallick Road Corridor Study – 2015   Summary of Project The boundaries of the Division Avenue and Wallick Road Corridor Plan are College Drive and Wallick Road (north to south), and Division Avenue and South Greeley Highway (west to east)....