West Allison Road Corridor

Purpose and Project Corridor

This plan is for the proposed W. Allison Rd. reconstruction from S. Greeley Highway to Parsley Blvd. This plan is for preliminary design and engineering. Allison Rd. is classified as a Collector and the road cross section options for the corridor shall be designed as per the guidelines in the current City Road Standards. PlanCheyenne’s Long Range Transportation Plan adopted by the City of Cheyenne in 2006, identifies Allison Rd. from Cribbon Ave. to Avenue C to be rebuilt to urban standards. The Allison Road corridor goes through both City and County lands but since it is within the Urban Growth Boundary, it should be planned and designed as an urban roadway with curb, gutter, and sidewalk. Because of the three schools and residential predominance in this area, it is essential for this corridor to provide a good walkable pedestrian environment.

West Allison Road Corridor Final Report
Final Drainage Report, Existing Sub-basin MapDeveloped Sub-basin Map
Plan Recommendations – 3rd Meeting January 2010
Project Recommendations
Recommended Street Sections
Recommended Alignment
Recommended Improvements
2nd Meeting – August 2009
Presentation
Summary of Public Comment from Public Meeting August 5, 2009
1st Meeting – March 2009
W Allison Road Proposed Design
W Allison Road Corridor
Existing Zoning
Design Contraints
Traffic Calming Options
Summary of Public Comment
I’d like to be informed about this study as it progresses