FREE hit counter and Internet traffic statistics from freestats.com
About Cheyenne MPO
Transportation
Land Use
Data

Maps

Visit Cheyenne's Comprehensive Plan, PlanCheyenne
Visit Association of Metropolitan Planning Organizations
Visit Cheyenne and Laramie County Cooperative GIS Program
Visit City Planning & Development
Visit Laramie County Planning & Development

 

 

 

Greenway Extension Plan

Executive Summary

Appendix A - Design Documentation

Appendix B - Public Involvement Documentation

Appendix C - Engineers Estimate of Probable Cost

Appendix D - Agency Comments

Appendix E - Right of Way Aquisition Documentation and Addendum

Appendix F - 2007 Greenway Extension Plan Sets 35% Plans

 


The Cheyenne Metropolitan Planning Organization (MPO), the Greenway Advisory Committee (GAC), and the Cheyenne Parks and Recreation Department have selected three areas for the next planning phase.

Holliday Park Connector - A Greenway path that extends west from the soon-to-be-built Greenway near Henderson Dr. along the Union Pacific ROW, through the Norris Viaduct intersection and on to Holliday Park. (The length of this section is approximately 1.4 miles)

South Side School Connector – This section is a discontinuous path that connects the pedestrian bridge near Deming and Walterscheid to the soon-to-be-built Safe Routes to Schools (SRTS) path. The SRTS path runs just south of the South Park subdivision neighborhood and will connect to the north side of the I80 pedestrian bridge. On the south side of the I80 pedestrian bridge the path will pick up and eventually connect to the Safe Routes to School path on the north side of Johnson Jr. High School. It will connect the SRTS path to surrounding neighborhoods, Parsley Blvd., Allison Rd. and Walterscheid Blvd. south of Fox Farm Rd. (The length of this section is approximately 1.5 miles total)

Detention Ponds - This path will head east from the soon-to-be-built Sun Valley Phase III Greenway near the cul de sac on Baldwin Drive., and continue around the detention ponds and finally tie into the southern end of Taft Ave. (This section is approximately .9 miles long)

 

I’d like to be informed about this study as it progresses

 

 

Home    About Cheyenne MPO    Transportation    Land Use    Announcements    Data    PlanCheyenne    Maps

©2002 City of Cheyenne and the Metropolitan Planning Organization